Skip to content

Sub-catchment Facts

Every sub-catchment, node and reach is measured when the sub-catchments are created, and again after each edit that changes it. The measured values are facts: facts about the ground that every hydrologic method starts from. They are not a model's opinion. There is no time of concentration, runoff coefficient, loss or land use among them.

Where to read them

Click a sub-catchment, a node or a reach on the map, or a row of the step's List. The facts open in one table at the foot of the map. Click × to close it.

  • A sub-catchment has two views. This sub-catchment is the ground that drains to its node by the stream it arrives on. Everything upstream is the node's total catchment: this sub-catchment, the node's other sub-catchments, and everything above the node. The line under the title says where its water goes: drains to the line, drains to a confluence, or drains to culvert (name).
  • A node is titled by its kind (Drainage point, Diverted point, Confluence, Culvert inlet or Forced point), with its level, and shows everything upstream of it. A culvert's node is titled Culvert (name) and also shows the culvert's area across the inlet and its flags (see Culverts).
  • A reach is read by clicking the stream on the map. It shows its length, fall and slope, and the kinds and levels of the nodes at its two ends.
  • A link is read by clicking it on the map. A diversion is titled Diversion, with what arrives first and its two ends, for example 14.6 ha arriving · from a diverted point … to a drainage point …; a link made from a can share water note is titled Shares water link, with its rise.

Click ⓘ beside a fact for its definition and its source. The definitions are the ones below, written by the server that measures them.

Facts of a sub-catchment and of a total catchment

Fact Shown as Definition
Area ha Plan area: the cells in the piece times the cell area, on the terrain's projected grid. Not the area of the sloping ground surface.
Longest flow path m Length of the longest flow path: the longest route water takes to the node, from cell centre to cell centre along the kept flow directions (a diagonal step is the cell size × 1.414; water that reaches the line away from the drainage point is taken straight along to it). It is the longest flow path, not the main stream: the main stream follows the bigger branch at each confluence up to the divide and can be shorter.
Relief m Level of the highest cell in the piece less the level at the node, on the terrain as supplied. The highest cell, not the highest point on the divide (the divide runs between cells), so it can be short by up to half a cell's rise.
Longest flow path slope m/m, and % Fall along the longest flow path over its length: level at its top cell less level at the node, on the terrain as supplied. Its top cell is not always the highest cell.
Equal-area slope m/m, and % Equal-area slope of the longest flow path: the slope of the straight line from the node with the same area under it as the long profile, 2 × (area between the profile and the node level) ÷ length². The profile is the terrain as supplied at each cell centre on the path, joined by straight lines; cells with no level are skipped.
Mean land slope m/m, and % Mean of the slopes of the cells in the piece, each from central differences with its four neighbours on the terrain as supplied (one-sided at the terrain edge). A cell next to ground with no level is left out. Rise over run, not degrees.
Centroid easting, northing Mean of the cell centres, as x, y in the terrain's projected coordinates. For a curved shape it can fall outside the piece.

The longest flow path itself is also kept as a line from its top cell to the node. It is drawn, not listed.

Facts of a reach

Fact Shown as Definition
Length m Length of the reach from its upper node to its lower node, from cell centre to cell centre along the kept flow directions (a diagonal step is the cell size × 1.414; water that reaches the line away from the drainage point is taken straight along to it).
Fall m Level at the upper node less the level at the lower node, on the terrain as supplied. It can be negative where the terrain as supplied rises along the flow path (the drainage analysis carved through it).
Slope m/m, and % Fall over length.

Facts of a diversion

A diversion carries a diverted point's water along the line to the drainage point it is diverted to (see Sub-catchments). It is drawn along the delineation line. Its facts are read on the line, and no flow is given:

Fact Shown as Definition
Area arriving ha Plan area arriving at the upper end: the total catchment of the drainage point the water is diverted from, which this diversion takes on to the receiving drainage point (its total catchment holds it). That total matches step 2's arrives in all only when the catchment the water is diverted from is in the set.
Length m Length along the line from the drainage point the water is diverted from to the receiving one.
Fall m Level at the low point of the catchment the water is diverted from less the level at the receiving low point, on the line. It is negative where the receiving low point is higher.
Slope m/m, and % Fall over length.
Drain depth m Depth of a drain along the line from the upper low point to the receiving one, falling at 0.5 % from the upper low point: the most the ground on the line stands above it (step 2's drain depth).

A link you make from a can share water note (see Make this a link) carries one fact, Rise: the rise water climbs to pass from one sub-catchment to the other, measured on the line's can share water mark.

Sources

Each fact names what it reads:

  • the drainage analysis grid: the cells of the terrain's drainage analysis, on the grid the line ran on;
  • the terrain as supplied: the levels of the terrain file itself. Levels and slopes are never read from the drainage analysis's conditioned surface, where hollows were carved through or filled;
  • the kept flow directions of the drainage analysis: the direction water leaves each cell, as the line used it.

How the distances are measured

Every distance follows the kept flow directions, from cell centre to cell centre, to the node, not to the edge of the piece. A node takes one sub-catchment per stream that arrives at it, so a smaller stream's water can run through the cells of a neighbouring sub-catchment of the same node for its last step or two.

Two kinds of water are taken straight to their node instead:

  • water that reaches the line away from a catchment's drainage point, which is taken along to the drainage point, as on the line;
  • water that leaves a sub-catchment for another node's where you dragged a boundary by hand (see Drag a boundary). It is taken straight to the node of its own sub-catchment.

After an edit

An edit measures only what it changed. A sub-catchment that holds the same cells as before keeps its facts; a sub-catchment or total catchment that changed is measured again. When you merge two sub-catchments of one node, the facts of the joined one come from its two parts: area is their sum, relief the larger, the longest flow path and its slopes those of the part with the longer path, and centroid and mean land slope the area-weighted mean (the same as measuring the joined piece, to the stored rounding).

Facts in an adopted layer

When a line's catchments are adopted with confirmed sub-catchments, each sub-catchment, node and reach in the layer carries its facts as attributes: area_ha, longest_flow_path_length, relief, longest_flow_path_slope, equal_area_slope and mean_land_slope for a sub-catchment (a node's are those of its total catchment, with its level_m), and length, fall and slope for a reach. Slopes are in m/m and lengths and levels in metres.